This project involved a deferred maintenance upgrade to one of the campus’ oldest buildings that houses administration and a working Chapel on the second floor. All brick has been repointed, rotted window frames and casings have been replaced, wood trims and fascia have been replaced, roofing was replaced as well as all flashings. Roof leaks were eliminated with new flashings and review of elevator penthouse penetration through the roof, as well as reworking of cupola to repair all damaged areas and repainting of all trims and cupola. Floor diaphragms were repaired as well as brick stabilization and header repair to seismically upgrade the structure.